3D Control
Aerospace and Defense
Supplier
CUSTOMER
- Manufacturer of structural parts and complex aeronautical equipment
TARGET
- Secure dimensional conformity of parts for design
NATURE OF SERVICE
- 3D control of hydraulic and fuel pipes, elementary parts, floor rails and metal sheet panels
- ATA: 28 – fuel, 29 – hydraulic power, 53 – fuselage
TASKS
- Establish the necessary tolerance, protocol and means for the inspection
- Inspection of hydraulic and fuel pipes, elementary parts, floor rails and metal sheet panels
- Provide own tools (2 lasers, 2 arms)
- Set up a Work Unit management and dedicated flow for customer priorities management
- Provide accurate and detailed reporting and documentation
LOCATION
- Saint-Nazaire, France
PROJECT KEY FIGURES
- Project started in 2014
TEAM
- 10 FTEs in 2 shifts
KEY ACHIEVEMENTS & RESULTS
- More than 80,000 inspected parts per year
- Decreased working unit costs > 4% per year
- 12 FTE dedicated