CQI-11 – Special process plating system assessment, according to AIAG manual - #TEC111

Price on request

  • Duration 2.5 days
  • Validation TRIGO Training certificate
  • Training type Classroom
  • Delivery methodOn site
  • Session type Dedicated /In-company session
  • Number of participants 4 p. min - 9 p. max (on site)
  • Languages Training material: English / French Trainers: 25+ spoken languages by TRIGO trainers all over the world

Description

You would like to know what customer requirements apply according to the CQI-11 self-assessment handbook on the control of the special surface treatment process and the self-assessment rules.

You would like to prepare an action plan to comply with CQI-11.

  • Understand the specific requirements of American car manufacturer customers.
  • Be aware of the contents of the CQI-11 manual (self-assessment tables, product audit, etc.).
  • Identify the key points of the manual and the gaps to be filled in order to comply with the manual.
  • Learn how to use the self-assessment questionnaire in the CQI-11 manual through a self-assessment exercise in the workshop.
  • Build an action plan to apply the handbook.
  • Process / Industrialization / Methods / Maintenance Managers & Engineers
  • Quality Managers & Engineers
  • Auditors

The training method alternates between theory on the requirements of the CQI-11 manual and application through exercises, followed by a practical self-assessment exercise.

Knowledge test (Multi Choice Questions)

Participant file containing the training material and exercises. Training materials in digital format are made available to trainees a few days before the course.

Consulting services: TRIGO can assist you with the practical implementation of the system in your company. Contact us to learn more.

Prerequisites

  • Have the latest edition of the CQI-11 manual as well as the Assessment Workbook (Excel file).

Required equipment: Personal Computer + reliable internet connection

Program

  1. ½ day to be planned before the session to prepare the training
  2. Introduction: AIAG releases and specific requirements of US car manufacturers.
  3. The objectives and scope of the CQI-11 handbook.
  4. Auditor qualifications, questionnaire and requirements for the self-assessment report.
  5. Responsibility requirements in section 1 (system type) and section 2 (process type)
  6. Requirements for equipment.
  7. Requirements for measuring and recording furnace temperatures.
  8. The requirements of section 3 (technical) in line with the applicable tables.
  9. Requirements relating to the auditor role
  10. Preparing and carrying out the self-assessment in the company.