Technical Incoming Inspection
Aerospace and Defense
OEM
CUSTOMER
- European aircraft manufacturer
TARGET
- Secure the quality of Cabin parts before installation in FAL
- Work Unit management
- Reporting on suppliers performance
NATURE OF SERVICE
- Inspection of cabin parts (seats, galleys, lavatories, overhead panels)
- ATA: 25 – equipment, 44 – cabin systems
TASKS
- Set up a Work Unit management process
- Inspection of cabin parts with dedicated team
- Reporting on suppliers’ performance
- Harmonized standard operating procedures on all sites
- Trigoscope© tool implementation
- Quality feedback loop with Source inspection performed by TRIGO
LOCATION 1
- France
LOCATION 2
- Germany
PROJECT KEY FIGURES
- 14 000 parts inspected per month
- Reduction of findings in FAL by 75%
TEAM
- 10 Inspectors
KEY ACHIEVEMENTS & RESULTS
- 100% of parts arriving on FAL were conformed
- Competitive service(thanks to a local intervention) + international best practices sharing
- On-demand intervention
- Inspection Report, 14000 parts inspected per month
- Optimization of release leadtime (from 4WD to 1WD for seats)
- Reduction of findings in FAL by 75%